We passed final inspection last week, after we failed the first one. There was a problem with the hood, which is actually commercial grade and requires a separate breaker. I should have suspected there might be an issue when I turned it on and it sounded like a 747 was landing in my living room. Don't get me wrong--this thing is awesome--but it required just a little more electrical work than expected.
These are the pictures taken by the cabinetmakers--we never got a chance to take a "finished product" shot, since the movers came at the same time as final installation was occuring. We're very pleased with the results--it was a pain in the ass to get here, but worth it!
No comments:
Post a Comment