Work on the floors has begun. The contractors put the plywood down in the media room, to even out the bare concrete floor that was under the carpet. It looks a little like a shooting rampage happened in there. . .the floor is littered with .22 caliber casings. Seems appropriate for Halloween.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment